Class 5 Office Building Design Sydney
Office buildings and commercial workplace design across Sydney. Standalone offices, tenancy fit-outs, medical suites with Section J energy compliance.
Contact UsOffice design scope
- Standalone office buildings (new construction)
- Office fit-outs in existing buildings
- Medical and dental suites
- Co-working spaces and business incubators
- Home-to-office conversions (change of use)
Costs and timeline
| Scale | Design fee | DA timeline |
|---|---|---|
| Small standalone (500 m²) | $50,000 – $120,000 | 4 – 6 months |
| Medium (2,000 m²) | $120,000 – $300,000 | 6 – 9 months |
| Tenancy fit-out | $3,000 – $8,000 per m² | CDC 2–4 weeks / DA 6–12 weeks |
Frequently Asked Questions
What is a Class 5 building?
Class 5 covers office buildings used for professional or commercial purposes. It includes standalone offices, office floors in mixed-use buildings, medical offices, and co-working spaces. Class 5 buildings need commercial-grade compliance: fire safety, disability access, hydraulic services and acoustic separation.
How much does office building design cost in Sydney?
Small office building (2–3 storeys, 500 m²): design fees $50,000–$120,000. Medium office (4–6 storeys, 2,000 m²): $120,000–$300,000. Fees typically 5–8% of construction cost. Fit-out design is separate ($3,000–$8,000 per m² of internal area).
Can I convert a house to an office?
Yes — but the change of use triggers commercial standards: disability access (ramps, accessible toilets), fire safety upgrades, and parking compliance. Zoning must permit office use (B1 Neighbourhood Business, B2 Local Centre, B4 Mixed Use, or SP zones). A change of use DA is required.
What BASIX and energy standards apply to offices?
Offices need Section J of the NCC (energy efficiency) compliance — more complex than BASIX. This includes facade thermal performance (U-values, glazing-to-wall ratios), artificial lighting power density, HVAC efficiency, and often solar PV and battery storage systems.
How long does office DA approval take?
Small office building: 4–6 months DA. Medium office in established commercial precinct: 6–9 months. Mixed-use projects with residential components: 9–12+ months. Pre-lodgement meetings significantly reduce timelines.
Do office buildings need a Registered Design Practitioner?
Small Class 5 office buildings alone do not require RDP sign-off under the DBP Act 2020 (which applies to Class 2, 3 and 9c). However, if the building has any Class 2, 3 or 9c component (mixed-use with apartments, hotel or aged care), the entire building becomes regulated. We advise on regulatory status at feasibility stage.